hina port crane manufacturer
In 2026, a four-link portal crane from a China port crane manufacturer is quoted between USD 150,000 and 600,000 FOB, while rail-mounted gantry cranes run USD 800,000–2.5 million and ship-to-shore container cranes USD 5–12 million. Steel prices have stabilized this year, so landed cost now depends mainly on capacity, span, and customization level.
| Type | 2026 Price Range (FOB China) | Suitable Scenario | Pros | Cons |
|---|---|---|---|---|
| Four-Link Portal Crane | USD 150,000 – 600,000 | General cargo berths, steel and bagged goods | Low entry cost; simple maintenance; hook or grab options | Limited speed for large containerships |
| Rail-Mounted Gantry Crane (RMG) | USD 800,000 – 2.5 million | Container yards and rail–port intermodal terminals | High stacking density; automation-ready; low energy per move | Fixed rails require civil works and layout commitment |
| Mobile Harbor Crane (MHC) | USD 2 – 6 million | Multipurpose ports with scattered or seasonal berths | No fixed infrastructure; fast relocation; handles bulk and containers | Higher unit price; lower peak productivity than STS |
| Ship-to-Shore (STS) Crane | USD 5 – 12 million | Dedicated container terminals serving mainline vessels | High single-move efficiency; large outreach; dual-trolley options | Heavy foundation investment; 10–14 month lead time |
Mainly three factors: local steel and casting supply reduces material cost, large-scale in-house machining cuts outsourcing fees, and lower labor rates reduce assembly cost. The design standards (FEM, ISO, or GB) can be identical, so the saving comes from the supply chain rather than reduced quality. Most buyers report 25–40% savings on comparable specifications in 2026.
A FOB quote usually excludes ocean freight, transport to site, foundations and embedded rails, on-site installation and commissioning, customs duties, and initial spare parts. These items typically add 20–35% to the equipment price. Ask the manufacturer for a CIF or DAP quotation plus a commissioning scope list, so the total investment is visible before you commit funds.
Prepare five figures: rated lifting capacity, rail gauge or working span, lifting height above and below quayside, cargo type (container, coal, ore, or steel), and local power supply. Include your design vessel size if relevant. Complete data lets the factory return a firm price within 3–7 working days, while vague inputs often cause revised quotes and delayed delivery.