hina port crane manufacturer
Match the crane to the job: STS units serve vessel berths at large container terminals, RTG cranes let yards reconfigure blocks without rails, and RMG systems cut energy cost per move in automated stacks. The 2026 comparison below from a China port crane manufacturer helps you decide by throughput, cargo mix and budget.
Before comparing models, be clear on what this equipment category does. Port cranes are lifting equipment specially designed for port loading and unloading operations, and they act as the core equipment of the port logistics system.
The four types below cover the majority of terminal projects. Read the applicable-scenario column before the price column — the wrong type costs more than any discount can recover.
| Type | Typical Capacity | Applicable Scenario | Pros | Cons |
|---|---|---|---|---|
| STS quay crane | 40-65 t under spreader; 50-70 m outreach | Deep-water berths serving 8,000-24,000 TEU vessels | 25-30 container moves per hour per crane | Heavy civil works and quay rails required; lead time of 10-14 months |
| RTG | 40-50 t; stacks 1-over-5 to 1-over-6 | Container yards that reconfigure blocks often | No fixed rails; relocates between blocks in under an hour | Diesel versions carry fuel cost; e-RTG needs power infrastructure |
| RMG | 40-50 t; stacks 1-over-6 to 1-over-8 | Automated yards, inland rail hubs, intermodal terminals | Energy cost per move runs 50-60% below diesel RTG; automation-ready | Rails lock the layout; civil works extend the project schedule |
| Mobile harbour crane | 80-150 t hook load | Multi-cargo ports mixing containers, coal, ore and steel | One machine covers all cargo types through quick attachment changes | Container cycle rate sits below an STS line |
Not at the same moment, but one machine can switch between them. Mobile harbour cranes and portal jib cranes take a telescopic spreader for containers, a grab for coal or ore, and a hook for steel pieces. Changeover runs 10-20 minutes with a trained crew. If your container volume stays under about 100,000 TEU a year, one multi-purpose crane usually covers the mix at a lower total cost than a dedicated container line.
Start with your annual move count. Above roughly 100,000 moves a year, an electrified RTG normally pays back the extra power infrastructure within 3-5 years through lower energy and maintenance spending. Diesel-electric units still make sense where grid access is unstable or blocks relocate often. Many buyers order e-RTG units with cable reels for fixed blocks and keep one diesel unit as backup.
Standard RTG units typically ship 4-6 months after drawing approval; STS cranes take 10-14 months because of their size. Sea transport runs in sections, and on-site erection takes 2-4 weeks for an RTG and 6-10 weeks for an STS, depending on quay readiness. Fix the drawing-approval milestone in your contract — schedule delays usually trace back to that date.