
China overhead crane prices
Two quotes for the same 10-ton overhead crane from China can differ by USD 8,000 or more. The gap rarely means one supplier is overcharging — it usually reflects duty class, hoist brand and scope of supply. Here is how to read China overhead crane prices line by line in 2026.
Four factors explain the spread between quotes.
Typical FOB ranges for a 10-ton crane with a 10.5 m span and 6 m lift in 2026. Your span, duty class and options move the final number.
| Configuration | Typical FOB Price (USD) | Typical Applications | Advantages | Limitations |
|---|---|---|---|---|
| Single girder + wire rope hoist, A3–A4 | 7,000–13,000 | Maintenance shops, light fabrication, low cycle rates | Lower price, lighter runway loads, simpler installation | Side-mounted hoist reduces hook height; not suited to continuous duty |
| Double girder + European-style hoist, A5 | 18,000–30,000 | Production lines with frequent lifts, longer spans | Higher hook height, compact hoist, smoother VSD control | Heavier structure; runway beams may need reinforcement |
| Double girder heavy-duty, A6–A7 | 30,000–55,000+ | Steel handling, foundries, near-continuous operation | Built for high cycle counts, magnet or grab options, hardened wheels | Highest price of the three; lead time typically 45–70 days |
Match the configuration to your actual lifts per hour, not to the largest number on a spec sheet.
Usually three things: a lower duty class hiding behind the same capacity figure, a lighter hoist brand, and missing scope such as VSD drives, spare parts or a thinner paint system. Ask each supplier for a breakdown — hoist model, motor power, steel grade, duty class, included accessories. A cheap quote that ships an A3 crane when your workload needs A5 will cost you more in year two than it saved on day one.
China overhead crane prices are typically quoted FOB — the crane is loaded at a Chinese port, and sea freight, insurance, customs and installation are yours. A 10-ton single girder crane usually fits in one 40-foot container; double girder cranes often ship disassembled on flat racks. Budget separately for sea freight, commonly USD 2,000–5,000 depending on destination, and for commissioning, either an engineer visit or guided remote installation.
If you lift more than 15–20 times a shift, in many cases yes. The hoist body is smaller, so you gain hook height, and VSD control reduces load swing — which matters when positioning steel coils or machined parts. Expect to pay USD 4,000–9,000 more than a standard wire rope hoist. For a maintenance shop lifting a few times a day, a standard hoist remains the rational spend.