China overhead crane prices
For lifts under 20 tons on a single shift, a single girder crane from China costs 30–45% less and moves the same load. If your site runs port-style continuous handling of steel, coal or containers, the upper end of China overhead crane prices in 2026 — a double girder unit — repays that gap in uptime within two to three years.
Port cranes are lifting equipment specially designed for port loading and unloading operations. They handle containers, bulk cargo such as coal and ore, and piece goods such as steel, and they form the core equipment of the port logistics system.
When a warehouse copies that working profile, cargo type — not just tonnage — drives girder structure, duty class and attachment interfaces. Two 10-ton quotes can sit $12,000 apart because one crane lifts steel coils 8 times an hour and the other lifts machine parts twice a day.
| Configuration | Typical FOB Price (2026) | Capacity / Duty Class | Suitable Cargo & Scene | Pros | Cons |
|---|---|---|---|---|---|
| Single girder (LD type) | $7,000–16,000 | 5–16 t, A3–A4 | Machine parts, pallets, maintenance lifts in workshops | Low entry price, lighter runway, needs less headroom | Limited lift height, not built for continuous shifts or magnets |
| Double girder (QD/LH) | $18,000–40,000 | 10–32 t, A5–A7 | Steel warehouses, fabrication shops, heavy piece goods | Greater lift height, service walkways, accepts magnets and grabs | Costs 40–60% above single girder, heavier runway and columns |
| Double girder, magnet/grab-ready | $30,000–65,000 | 10–20 t, A6–A8 | Port-style warehouses moving coal, ore, steel coils, containers | Continuous cycle handling, fast change between hook, magnet and grab | Costs more than the other two, needs cable reel and extra power |
No. If you lift under 20 tons, run one shift and keep hooks under 9 meters, a single girder unit does the same job for $10,000–25,000 less. The double girder investment pays back only when duty is heavy: two shifts, 20 or more full-load cycles per hour, or attachments such as magnets and grabs. Match the structure to your duty cycle, not to the largest number on a spec sheet.
Yes, and this is how port logistics warehouses operate daily. Port cranes are built to switch between containers, bulk cargo such as coal and ore, and piece goods such as steel; an overhead crane can follow the same logic. Order a hook for bagged cargo plus a coil lifter or magnet for steel. Budget $2,000–8,000 per attachment, confirm the duty class covers both cycles, and check that your power supply supports a magnet.
Moving from A3 to A6 typically adds 20–35%, because motors, gearboxes, brakes and girder steel all get upgraded. For one-shift maintenance work, that money is wasted. For two-shift loading and unloading that mirrors port operations, the upgrade costs less than the structural fatigue cracks an A3 frame often develops within two to three years of continuous cycling.