Single Girder or Double Girder: Which China Overhead Crane Price Fits Your Cargo Handling in 2026?

Single Girder or Double Girder: Which China Overhead Crane Price Fits Your Cargo Handling in 2026?

China overhead crane prices

For lifts under 20 tons on a single shift, a single girder crane from China costs 30–45% less and moves the same load. If your site runs port-style continuous handling of steel, coal or containers, the upper end of China overhead crane prices in 2026 — a double girder unit — repays that gap in uptime within two to three years.

Why Cargo Type Moves China Overhead Crane Prices More Than Capacity

Port cranes are lifting equipment specially designed for port loading and unloading operations. They handle containers, bulk cargo such as coal and ore, and piece goods such as steel, and they form the core equipment of the port logistics system.

When a warehouse copies that working profile, cargo type — not just tonnage — drives girder structure, duty class and attachment interfaces. Two 10-ton quotes can sit $12,000 apart because one crane lifts steel coils 8 times an hour and the other lifts machine parts twice a day.

What the 2026 China Overhead Crane Price Buys at Each Level

  1. Structure built around loading and unloading cycles. Port cranes are specially designed for repeated loading and unloading operations; a crane ordered at A6–A8 duty follows the same logic, sustaining 20+ full-load lifts per hour against 6–8 on a standard A3 workshop unit.
  2. One crane covers mixed cargo. The same principle that lets port cranes switch between containers, coal, ore and steel works indoors: a hook, coil lifter, magnet or grab interface lets a single crane serve several cargo lines, with attachments priced at roughly $2,000–8,000 each.
  3. The crane is the core equipment of your logistics flow, not an accessory. A 10-ton double girder running 25 cycles per hour moves about 250 tons per hour, so every hour of downtime costs more than the machine itself.
  4. The price tracks steel and duty class, so you can audit it. A 10-ton single girder carries about 3–4 tons of steel, a double girder 7–9 tons; checking tonnage, duty class and motor brands against a quote tells you whether its number holds up.

2026 China Overhead Crane Prices: Three Configurations Compared

ConfigurationTypical FOB Price (2026)Capacity / Duty ClassSuitable Cargo & SceneProsCons
Single girder (LD type)$7,000–16,0005–16 t, A3–A4Machine parts, pallets, maintenance lifts in workshopsLow entry price, lighter runway, needs less headroomLimited lift height, not built for continuous shifts or magnets
Double girder (QD/LH)$18,000–40,00010–32 t, A5–A7Steel warehouses, fabrication shops, heavy piece goodsGreater lift height, service walkways, accepts magnets and grabsCosts 40–60% above single girder, heavier runway and columns
Double girder, magnet/grab-ready$30,000–65,00010–20 t, A6–A8Port-style warehouses moving coal, ore, steel coils, containersContinuous cycle handling, fast change between hook, magnet and grabCosts more than the other two, needs cable reel and extra power

Which Configuration Fits Your Operation in 2026

  • Workshop, under 10 t, one shift: order a 10-ton single girder at $9,000–14,000 FOB and put the savings into a better hoist brand and longer warranty terms.
  • Steel yard or coil warehouse: a double girder at A6 duty with a $3,000–6,000 magnet, totaling $28,000–45,000, keeps 25+ cycles per hour sustainable.
  • Port logistics warehouse handling coal, ore or containers: specify A7–A8 with grab and spreader interfaces, write the required cycles per hour into the contract, and expect $45,000 and above.
  • Growth plans on the horizon: build the runway and columns for double girder loads now, start with a single girder, and upgrade the crane later without touching the building.

Buyer Questions About China Overhead Crane Prices in 2026

Is the double girder overhead crane price always worth paying?

No. If you lift under 20 tons, run one shift and keep hooks under 9 meters, a single girder unit does the same job for $10,000–25,000 less. The double girder investment pays back only when duty is heavy: two shifts, 20 or more full-load cycles per hour, or attachments such as magnets and grabs. Match the structure to your duty cycle, not to the largest number on a spec sheet.

Can one crane handle steel coils in the morning and bulk bags after lunch?

Yes, and this is how port logistics warehouses operate daily. Port cranes are built to switch between containers, bulk cargo such as coal and ore, and piece goods such as steel; an overhead crane can follow the same logic. Order a hook for bagged cargo plus a coil lifter or magnet for steel. Budget $2,000–8,000 per attachment, confirm the duty class covers both cycles, and check that your power supply supports a magnet.

Does a higher duty class really add that much to China overhead crane prices?

Moving from A3 to A6 typically adds 20–35%, because motors, gearboxes, brakes and girder steel all get upgraded. For one-shift maintenance work, that money is wasted. For two-shift loading and unloading that mirrors port operations, the upgrade costs less than the structural fatigue cracks an A3 frame often develops within two to three years of continuous cycling.